Armech solutions have been involved in some great projects. read some of our stories below.

Acoustic Induced Vibration Study
Background Armech Solutions received a request for a proposal by a wellestablished Oil and Gas company that undertake Engineering Procurement and Construction (EPC) projects, predominantly

Turnkey Development & Design of a Downhole Mechanical Shifting Tool
Check out this case study to find out how Aremch Solutions worked with UMS Flowell on their Flow Management Diverter Valve (FMDV), a key element to their system.

Pile Gripper FEED Study
Armech Solutions Background The installation of offshore wind farms is progressively increasing to maximise renewable energy production and decarbonise the grid. There is a continued

Fatigue Assessment of a Davit Using Finite Element Analysis
Background The client is a leading marine offshore handling system supplier, with clients in many industries such as defence, energy and oceanographic science. They provide

Fatigue Assessment Using FEA of a LARS Tow Winch
Challenge Tow winches used in a marine environment are subject to harsh, arduous operating conditions. Typically they are designed to withstand high shock loading –